We helped early with the design process and contributed to many smart design features being adopted.

Breakout Creek 3 Elevated Boardwalk
Bowhill Media2025-07-08T21:50:50+09:30This project involved Bowhill staff Learn How
Pine Gap Power Station Extension
Bowhill Media2025-07-08T22:07:11+09:30Detailed site survey and accurate 3D drawings to match
Pine Gap Substation Upgrade
Bowhill Media2025-07-08T22:07:26+09:30Supply, fabricate, surface treat, erect
Driven Pile Reaction Frame
Bowhill Media2025-07-08T22:14:55+09:30Being a 1,200 tonne reaction frame this unit needed to be manufactured with the utmost focus on its structural integrity.
Christies Beach Desalination Plant
Bowhill Media2025-07-08T22:23:16+09:30The steelwork that this job required was mainly erected over what could only be described as a very corrosive environment.
CHAY Bulk Rail Carriage Component Manufacture
Bowhill Media2025-07-08T22:15:15+09:30The scope of the job included: Manufacture of production jigs and assembly and welding 140 units of each component.
ASKA (Australian Square Kilometre Array)
Bowhill Media2025-07-08T22:15:59+09:30ASKA is basically stage 1 of a potential “super radio telescope” funded by over 20 countries and larger and more sophisticated than ever before attempted.
APA & Bocco Large Electrical Enclosure Base frame
Bowhill Media2025-07-08T22:22:03+09:30Manufacture methodology was designed for efficiency to benefit our client.