In December of 2021 Bowhill were s Learn How
Sydney Gateway – SB91
Boweng Administrator2024-03-06T23:20:08+10:30Solution Breakthrough Bowhill delive Learn How
Mt Derrimut Girder MG4
Boweng Administrator2024-01-20T14:33:09+10:30Highly loaded and critical areas o Learn How
Breakout Creek 3 Elevated Boardwalk
Boweng Administrator2023-11-12T12:41:37+10:30This project involved Bowhill staff Learn How
Granite Island Causeway Project
Boweng Administrator2023-11-12T12:26:04+10:30We worked with McConnell Dowell ove Learn How
ANI Osborne Pedestrian Bridge Girders
Boweng Administrator2023-11-12T12:26:46+10:30Structural steel and metal works to the south, east and western sides of the existing building as well as a architectural entrance feature.
Ovingham Level Crossing Removal
Boweng Administrator2023-11-12T12:27:00+10:30Structural steel and metal works to the south, east and western sides of the existing building as well as a architectural entrance feature.
Riverbank Festival Bridge Adelaide CBD
Bonnie2023-11-12T12:27:41+10:30We were able to use the engineers 3D drawings to fast track the shop drawings by synchronising the two programs, thus a lot of information was able to be transferred to the steel detailing software.