Precision Pays off: manufacture technique was critical to achieving success on this complex project.

Learn How

We helped early with the design process and contributed to many smart design features being adopted.

Learn How

Largest logistical move into metro Adelaide required some innovative thinking!

Learn How

Design input & cost savings to client included recycled steel for temporary works

Learn How

Early design optimisation helped set this project off in the right direction

Learn How

Saved $350k and 4 weeks on Critical Path

Learn How

We designed & constructed the floating wharf to be suitable for rowing and the general public

Learn How

We were able to provide quick turn around time, multiple projects for water infrastructure.

Learn How

We saved Majors Road Bridge project $100K with a custom transport solution.

Learn How

Unique, safe and efficient solution

Learn How

We were able to provide quick turn around time, multiple projects for water infrastructure.

Learn How

24m long 5.5m wide mast was of a welded box section design and required post-weld grinding to achieve a contemporary archite …

Learn How

This project was a design and construct structural/mechanical scope with a tight timeline.

Learn How

Adaptability and Compliance

Learn How

Precise timing to ensure mininal disruption to Melbourne Metro Rail

Learn How

Our onsite electrian pre-assembled the gantry crane, saving precious down time during installation on site.

Learn How

We saved Majors Road Bridge project $100K with a custom transport solution.

Learn How

Many large components for platforms and agitator frames on top of the leach tanks involving complex welding and surface…

Learn How

Quality plans and ITP were completed with little fuss in a professional and detailed and accurate manner

Learn How

Preassembled modules assembled at ground level, effectively negated the need for EWP…

Learn How

7500 x 800 x 1200 passivation tank (approx 6000L)

Learn How

Built Environs. Shop Drawings, supply of 800WB members, fabrication, shear studs, surface preparation and treatment, transpo …

Learn How

A small modular design that could be adapted to the various chamber layouts was utilised to simplify fabrication and erectio …

Learn How

Removable decks units involving complex surface treatment techniques on a submerged fabrication application.

Learn How
Dulux Protective Coating Certificate of Excellence for applying a tricky system to such a high standard.

Learn How

250 + tonnes of structural and mechanical support structures including fabrication, surface treatment and delivery to site.

Learn How
Sub-arc welding, shear stud and full penetration NDT’d splice welding was carried out seamlessly by the skilled staff at Bow …

Learn How

Tripling a mines capacity

Learn How

The sequencing of the fabrication and surface treatment operations was done in a very coordinated manner.

Learn How
By fabricating and coating the significant main horizontal deck in one piece, it allowed quick site installation, minimal co …

Learn How

Bowhill were instrumental in developing a modular skid and tank design to suit the purposes of this build for our client.

Learn How

Transport of these 20+ items was the key to achieving a successful outcome.

Learn How

Conversion of old imperial, outdated design into a new streamlined design reflective of available modern technologies and pr …

Learn How

Manufacture methodology was designed for efficiency to benefit our client.

Learn How

Arrium Train Maintenance Platform Steelwork
Mechanical design to allow safe access to the train roof had to be correct.

Learn How

This job necessitated the manufacture of 5 pedestrian bridges consisting of 10 girders in total, each approx 25m long.

Learn How

Due to the size of the units (6 m wide, 8 m long and 4m in height), the manufacturing methodology had to reflect the awkward …

Learn How
Boweng together with our client McDowell have been able to design and build very effective solutions to complex temporary wo …

Learn How

The clipper ship “City of Adelaide” is currently located in Scotland, The project to return the world’s oldest clipper ship, …

Learn How

ASKA is basically stage 1 of a potential “super radio telescope” funded by over 20 countries and larger and more sophisticat …

Learn How

Bowhill successfully completed the full submersion passivation of 1,000+ super duplex S/S components for this important proj …

Learn How

The steelwork that this job required was mainly erected over what could only be described as a very corrosive environment.

Learn How

Being a 1,200 tonne reaction frame this unit needed to be manufactured with the utmost focus on its structural integrity.

Learn How

Supply, fabricate, surface treat, erect

Learn How

Detailed site survey and accurate 3D drawings to match

Learn How

Design, supply and deliver large racks to site

Learn How

The scope of the job included: Manufacture of production jigs and assembly and welding 140 units of each component.

Learn How

Mosquito Creek Bridge

Learn How

We were able to use the engineers 3D drawings to fast track the shop drawings by synchronising the two programs, thus a lot …

Learn How

The scope of the job included Structural Steel and Metal Works packages for a Visitor Information Centre and two workshops a …

Learn How

The unusual design of this building meant that the accuracy of the structural steel frame had to be within very tight tolera …

Learn How

Structural steel and metal works to the south, east and western sides of the existing building as well as a architectural en …

Learn How

Structural steel for the Bastion wing, including demolition beams skylight frames, two stair flights and support steel for n …

Learn How

Manufacture of over 500m of heavy duty crash rail/balustrade.

Learn How

Show projects related to: