In December of 2021 Bowhill were s Learn How
Sydney Gateway – SB91
Boweng Administrator2024-03-06T23:20:08+10:30Solution Breakthrough Bowhill delive Learn How
Breakout Creek 3 Elevated Boardwalk
Boweng Administrator2023-11-12T12:41:37+10:30This project involved Bowhill staff Learn How
Pine Gap Power Station Extension
Bonnie2023-11-12T12:27:49+10:30Detailed site survey and accurate 3D drawings to match
Driven Pile Reaction Frame
Bonnie2024-01-20T14:38:59+10:30Being a 1,200 tonne reaction frame this unit needed to be manufactured with the utmost focus on its structural integrity.
Christies Beach Desalination Plant
Bonnie2023-11-12T12:32:07+10:30The steelwork that this job required was mainly erected over what could only be described as a very corrosive environment.
CHAY Bulk Rail Carriage Component Manufacture
Bonnie2023-11-12T12:32:22+10:30The scope of the job included: Manufacture of production jigs and assembly and welding 140 units of each component.
ASKA (Australian Square Kilometre Array)
Bonnie2023-11-12T12:32:52+10:30ASKA is basically stage 1 of a potential “super radio telescope” funded by over 20 countries and larger and more sophisticated than ever before attempted.
APA & Bocco Large Electrical Enclosure Base frame
Bonnie2021-11-11T03:22:12+10:30Manufacture methodology was designed for efficiency to benefit our client.