Raytheon | 2009

Detailed site survey and accurate 3D drawings to match. Fabrication and transport to central Australia (NT). Sequenced supply to work in with erection contractor. Approx 200t of steel, Bowhill facility produced up to 30t per week of structural (includes fab, weld, check, blast/paint, load etc).