Boweng together with our client McDowell have been able to design and build very effective solutions to complex temporary works such as cofferdams and a floating installation jig for the very long and slender apron straps.
Mindarie Zircon Mine
Bowhill Media2021-11-11T03:29:49+10:30Due to the size of the units (6 m wide, 8 m long and 4m in height), the manufacturing methodology had to reflect the awkwardness of moving these units.
Southern Expressway Pedestrian Bridges
Bowhill Media2023-11-12T12:33:23+10:30This job necessitated the manufacture of 5 pedestrian bridges consisting of 10 girders in total, each approx 25m long.
Arrium Train Maintenance Platform Steelwork
Bowhill Media2021-11-11T03:22:17+10:30Mechanical design to allow safe access to the train roof had to be correct.
APA & Bocco Large Electrical Enclosure Base frame
Bowhill Media2021-11-11T03:22:12+10:30Manufacture methodology was designed for efficiency to benefit our client.
Ferry Landings
Bowhill Media2021-11-11T03:22:05+10:30Conversion of old imperial, outdated design into a new streamlined design reflective of available modern technologies and processes.
Southern Expressway Major Sign Gantries
Bowhill Media2021-11-11T03:22:00+10:30Transport of these 20+ items was the key to achieving a successful outcome.
Sand Mining Process Water Flocculent Plant
Bowhill Media2023-11-12T12:34:08+10:30Bowhill were instrumental in developing a modular skid and tank design to suit the purposes of this build for our client.
Gardiners Creek Cable-stayed Pedestrian Bridge
Bowhill Media2021-11-11T03:21:52+10:30By fabricating and coating the significant main horizontal deck in one piece, it allowed quick site installation, minimal coating damage and the ability to pre-install the handrail panels off site, ensuring no fit up issues.
Dolphin Explorer Floating Access System
Bowhill Media2021-11-11T03:21:47+10:30The sequencing of the fabrication and surface treatment operations was done in a very coordinated manner.