The scope of the job included Structural Steel and Metal Works packages for a Visitor Information Centre and two workshops at Rocky River in the Flinders Chase National Park on Kangaroo Island.
Riverbank Festival Bridge Adelaide CBD
Bonnie2023-11-12T12:27:41+10:30We were able to use the engineers 3D drawings to fast track the shop drawings by synchronising the two programs, thus a lot of information was able to be transferred to the steel detailing software.
Pine Gap Power Station Extension
Bonnie2023-11-12T12:27:49+10:30Detailed site survey and accurate 3D drawings to match
Mindarie Sand Mine Drying Racks
Bonnie2021-11-11T03:23:38+10:30Design, supply and deliver large racks to site
Flinders University – Carpark No. 5
Bonnie2021-11-11T03:25:06+10:30Manufacture of over 500m of heavy duty crash rail/balustrade.
Driven Pile Reaction Frame
Bonnie2024-01-20T14:38:59+10:30Being a 1,200 tonne reaction frame this unit needed to be manufactured with the utmost focus on its structural integrity.
Christies Beach Desalination Plant
Bonnie2023-11-12T12:32:07+10:30The steelwork that this job required was mainly erected over what could only be described as a very corrosive environment.
CHAY Bulk Rail Carriage Component Manufacture
Bonnie2023-11-12T12:32:22+10:30The scope of the job included: Manufacture of production jigs and assembly and welding 140 units of each component.