We were able to use the engineers 3D drawings to fast track the shop drawings by synchronising the two programs, thus a lot of information was able to be transferred to the steel detailing software.
Southern Expressway Pedestrian Bridges
Bonnie2023-11-12T12:33:23+10:30This job necessitated the manufacture of 5 pedestrian bridges consisting of 10 girders in total, each approx 25m long.
Gardiners Creek Cable-stayed Pedestrian Bridge
Bonnie2021-11-11T03:21:52+10:30By fabricating and coating the significant main horizontal deck in one piece, it allowed quick site installation, minimal coating damage and the ability to pre-install the handrail panels off site, ensuring no fit up issues.
Seacombe Road Bridge – Southern Expressway
Bonnie2021-11-11T03:20:07+10:30Sub-arc welding, shear stud and full penetration NDT’d splice welding was carried out seamlessly by the skilled staff at Bowhill Engineering.
Dorrien Bridge
Bonnie2021-11-11T03:18:38+10:30Built Environs. Shop Drawings, supply of 800WB members, fabrication, shear studs, surface preparation and treatment, transport to site
Regency to Pym
Bonnie2024-02-28T12:14:43+10:30Early design optimisation helped set this project off in the right direction
Gawler River Pedestrian Bridge – Northern Expressway
Bonnie2024-03-24T22:17:00+10:30Quality plans and ITP were completed with little fuss in a professional and detailed and accurate manner
Flaxmill Road Bridge – Southern Expressway
Bonnie2024-03-24T22:15:12+10:30We saved Majors Road Bridge project $100K with a custom transport solution.
Cable Stayed Pedestrian Bridge in Canberra
Bonnie2024-03-24T22:04:36+10:3024m long 5.5m wide mast was of a welded box section design and required post-weld grinding to achieve a contemporary architectural effect.