A small modular design that could be adapted to the various chamber layouts was utilised to simplify fabrication and erection
Dorrien Bridge
Bonnie2021-11-11T03:18:38+10:30Built Environs. Shop Drawings, supply of 800WB members, fabrication, shear studs, surface preparation and treatment, transport to site
Passivation Facilities
Bonnie2021-11-11T03:18:32+10:307500 x 800 x 1200 passivation tank (approx 6000L)
Regency to Pym
Bonnie2024-02-28T12:14:43+10:30Early design optimisation helped set this project off in the right direction
Elevator Tower – Port Adelaide
Bonnie2024-03-24T22:19:29+10:30Preassembled modules assembled at ground level, effectively negated the need for EWP...
Gawler River Pedestrian Bridge – Northern Expressway
Bonnie2024-03-24T22:17:00+10:30Quality plans and ITP were completed with little fuss in a professional and detailed and accurate manner
BHBP Olympic Dam Tails Leach Circuit Upgrade
Bonnie2024-03-24T22:15:54+10:30Many large components for platforms and agitator frames on top of the leach tanks involving complex welding and surface treatment techniques.
Flaxmill Road Bridge – Southern Expressway
Bonnie2024-03-24T22:15:12+10:30We saved Majors Road Bridge project $100K with a custom transport solution.
Cable Stayed Pedestrian Bridge in Canberra
Bonnie2024-03-24T22:04:36+10:3024m long 5.5m wide mast was of a welded box section design and required post-weld grinding to achieve a contemporary architectural effect.