The unusual design of this building meant that the accuracy of the structural steel frame had to be within very tight tolerances.
Adelaide Aqua – Passivate Permeate Branches
Bonnie2021-11-11T03:23:13+10:30Bowhill successfully completed the full submersion passivation of 1,000+ super duplex S/S components for this important project.
50 Tonne Rubber Tyre Roller
Bonnie2021-11-11T03:16:25+10:30This project was a design and construct structural/mechanical scope with a tight timeline.
ASKA (Australian Square Kilometre Array)
Bonnie2023-11-12T12:32:52+10:30ASKA is basically stage 1 of a potential “super radio telescope” funded by over 20 countries and larger and more sophisticated than ever before attempted.
Clipper Ship Transport Frame
Bonnie2021-11-11T03:28:04+10:30The clipper ship “City of Adelaide” is currently located in Scotland, The project to return the world’s oldest clipper ship, the ‘City of Adelaide’, to Port Adelaide has reached an important milestone with the completion of the base of a giant 100 tonne steel cradle.
Lock 15 Lock & Weir
Bonnie2021-11-11T03:28:47+10:30Boweng together with our client McDowell have been able to design and build very effective solutions to complex temporary works such as cofferdams and a floating installation jig for the very long and slender apron straps.
Mindarie Zircon Mine
Bonnie2021-11-11T03:29:49+10:30Due to the size of the units (6 m wide, 8 m long and 4m in height), the manufacturing methodology had to reflect the awkwardness of moving these units.
Southern Expressway Pedestrian Bridges
Bonnie2023-11-12T12:33:23+10:30This job necessitated the manufacture of 5 pedestrian bridges consisting of 10 girders in total, each approx 25m long.
Arrium Train Maintenance Platform Steelwork
Bonnie2021-11-11T03:22:17+10:30Mechanical design to allow safe access to the train roof had to be correct.
APA & Bocco Large Electrical Enclosure Base frame
Bonnie2021-11-11T03:22:12+10:30Manufacture methodology was designed for efficiency to benefit our client.