RJ Robbins (head client Australian Zircon) – 2006/2007
250 + tonnes of structural and mechanical support structures including fabrication, surface treatment and delivery to site. This was a project that re-enforced the capability of the Murraylands Fabrication Consortium with stunning results.
Some quite large components were fabricated over the course of the project, including a large skidded water tank (15m dia in three sections), pipe gantry segments, skids and structural for the PCP as well as a underflow cone and pond wall segments for the 40m dia thickener to name just a few.