Main Scope: Supply and fabrication of Keel Support Frames for ANI. These frames are the foundation for the bilge blocks that support ships when they’re placed on trestles. The inside of these frames had to meet tolerances specified by the engineers to ensure that they don’t clash with the timber when installed.

Variation Scope (don’t list with wording relating to the main scope): ANI had engaged Bowhill to supply various accessories for their new hoist frames. The existing set was supplied around 2009 and the original drawings were lost, so we attended ANI CUF to measure the existing items, then create a BIM model with Assembly and Part drawings to assist with fabrication. 4 sets of accessories were built to match both the existing concrete plinths and new hoist frames. This also allowed ANI to have a new set of drawings for their records, in case any items needed to be replaced in the future.

Project Details

Project Description: Surveying existing assemblies and modelling them to recreate sets that match existing infrastructure.
Client: ANI
Client Contact: ANI
Year: 2023/2024
Project Categories
  • Compliance
  • Innovation