The ANI Osborne Pedestrian Bridge provides a new pedestrian crossing over the rail corridor at the Osborne Shipyard in South Australia. The crossing was delivered between June and September 2022 as a joint effort between Williams Metal Fabrications as the main steelwork contractor, McMahon Services, ANI and Bowhill Engineering.

The structure is built around a pair of pedestrian bridge girders, each 43 metres long and made up of three pieces. Preassembled and fitted out before leaving for the site, the finished 50 tonne structure was lifted onto its abutments in a single crane lift over a live rail corridor. It took careful planning and close collaboration between all parties to get it right.

Bowhill Engineering delivered a pair of 43m long 3-piece beams. These beams were quite long and slender and needed careful attention to ensure that they remained straight. We also planned their handling through every stage at our facility to avoid damage.

This was truly a joint effort. Williams Metal Fabrications were the main steelwork contractor. Bowhill worked as their subcontractor, completing the QA for the girders along with fabrication, welding and coating. We also assisted the WMF team with the preassembly of the girders at Bowhill.

The structure turned into a 43m long, 3.5m wide assembly weighing approximately 50t that was delivered and fitted out prior to being erected over the rail corridor. It was then lifted and placed straight from the assembly location onto the abutments with a 1200t crane.

Collaboration was key to this project, specifically the program, QA, inspection, and preparation prior to handing the project back to the WMF team for completion, which was important to get right.

Bowhill has the specialised capability to handle larger elements together with the compliance systems to deliver high specification requirements for most industries, especially Defence. We are proud to have worked alongside Williams Metal Fabrications, McMahon Services and ANI to help deliver this important work.

About Bowhill Engineering

Together we thrive. We fabricate heavy and complex structural steel for infrastructure projects across Australia. Contractors and engineers bring us in early to help with design optimisation. We then take the work through fabrication, welding, coating and preassembly at our own facility.

Our team includes boilermakers, metal fabricators, structural welders, industrial spray painters, CNC operators, robotic welder operators, project managers and project assistants, with apprentices and work experience students coming through the workshop every year.

  • Bridge fabrication capability, from pedestrian bridges to bridge girders for road, rail and public transport projects
  • Complete project delivery, from design optimisation and drafting through fabrication, surface treatment, transport and installation
  • Advanced manufacturing capability, with over $6 million invested in robotic welding systems and CNC machining
  • Structural components handled from 5 tonnes up to 140 tonnes, supported by overhead cranes up to 100 tonnes
  • Compliance systems built for high specification requirements, including Defence work
  • Certified to AS5131 CC3, ISO9001, AS4801, ISO14001 and Weld Australia AS3834.2
  • Major infrastructure delivered nationally, including 6,600 tonnes of tunnel segments for Torrens to Darlington and girders for Inland Rail
  • Early contractor engagement and value engineering that give clients cost certainty from the start
  • A strong safety culture and environmental compliance on every project

We invest in our people, our capability and our regional community to build the structures that connect Australia.

Other Projects And Solutions

We’ve delivered pedestrian bridges and structural steel fabrication for major infrastructure projects across Australia, including:

Regency to Pym Bridge Girder Fabrication
120 bridge girder sections totalling 1,500 tonnes, fabricated for Adelaide’s North-South Corridor  South Road Superway. Construction was carried out by McConnell Dowell and Bardavcol, with Bowhill’s steelwork forming the structural backbone of the completed superway infrastructure. 

 

Majors Road Bridge
18 fabricated three-piece girders were delivered to Acciona for the Southern Expressway duplication. The SAW welded and surface treated girders ranged from 23 to 31 metres long and weighed between 8 and 14 tonnes each, supporting the expansion of the existing two-lane overpass into six lanes.

 

Sydney Gateway SB61
Five open-top box girders, each weighing around 130 tonnes, were fabricated for a road bridge spanning over 70 metres on one of Australia’s biggest infrastructure projects. Delivered for John Holland Seymour Whyte Joint Venture and TfNSW to the highest compliance standards.

Doug, Tom and the team did an amazing job, all to a high standard without issue, being a truly professional organisation, the expected outcome was achieved on budget, on time and without incident

Stuart Rogers | GM of Williams Metal Fabrication

Project Details

Project Description: Working in with Williams Metal Fabrications, Bowhill Engineering have played a significant role in delivering a new pedestrian crossing for the Osborne Shipyard in South Australia.
Year: June 2022 – Sept 2022
Project Categories
  • Bridges
  • Defence
  • Featured