An Article written by the Murray Valley Standard showing the 96-wheeler vehicle used to move the largest steel fabrication for Bowhill.
An excerpt of the article can be viewed below:
An Article written by the Murray Valley Standard showing the 96-wheeler vehicle used to move the largest steel fabrication for Bowhill.
An excerpt of the article can be viewed below:
Thank you for Signing Up |
© 2023 Bowhill Engineering. All rights reserved.
(08) 8570 4208 | admin@boweng.com.au
Privacy Policy | Sitemap