Structural steel structure for supporting pump station and pipe work on the banks of the Murray River for large scale farm irrigation. The 3D Model was used to input real time site survey data of in -situ pile and footing locations, allowing the designers accurate information for fitment of the structure. Bowhill Engineering were able to work with our client to sequence deliveries to suit their installation methodology, this was key due to the restricted site access and minimal laydown area.

“Bowhill Engineering stood out for their meticulous attention to detail, clear pricing, and deep technical understanding. Despite being the second cheapest among three competitors, their comprehensive proposal and low project risk made them a preferred choice. Praised for their quality and professionalism, Bowhill was seen as very reasonable in commercial terms, delivering significant value.”

Jordan Gray | Maritime Constructions

Project Details

Project Description: Size: 35m long, 12m wide Weight: 120T
Client: Maritime Constructions
Client Contact: Jordan Gray
Year: 2023
Project Categories
  • Innovation
  • Transport