Complex brackets required as part of the Beachport Jetty upgrades, fabrication was completed faultlessly and surface treatment was a great opportunity for our STF team to apply Interzone 954 at 1000um on a tight intricate assembly, this was achieved through careful pressure and tip selection. Great work by all departments.