Blubuilt | 2016
Safe access platforms for the dual pit valve chambers located along the Murray Bridge to Onkaparinga pipeline.
Involved the design of safe access and work platforms to fit around existing pipework and valves.
A small modular design that could be adapted to the various chamber layouts was utilised to simplify fabrication and erection. The use of smaller components made it safer to manoeuvre the items around the existing structures during installation. In total approx. 10t of stick steel .